One team, one schedule, one point of contact, your whole home. We take houses down to the studs where needed and rebuild them for the way you live now.
3 to 6 months
typical time on site
Fixed scope
signed before work begins
One project lead
drawing to walkthrough
A complete renovation is where coordination matters most. Kitchens, bathrooms, flooring, walls, electrical and mechanical all interact, and the order of operations decides whether the project takes months or years. NUMI plans the entire scope before work starts and runs it as one continuous build.
Whole-home interior renovations
Structural changes and open-concept conversions
Kitchens and bathrooms within the larger scope
Flooring, trim and doors throughout
Full electrical and plumbing updates
Insulation and window upgrades
Design services for the complete vision
Staged scheduling if you are living in the home
A real NUMI project. Drag the handle to compare.
We give you an honest range at your consultation and a fixed number after design. These are the factors that move it, and how long the work takes.
Structural scope
Removing walls and adding beams is engineering plus finishing on both floors.
Mechanical age
Older wiring, plumbing and furnaces often deserve upgrading while walls are open.
Finish level
The same layout can be finished at very different price points.
Living arrangements
Staying in the home is possible but extends the schedule.
Complete renovations typically run three to six months on site depending on scope and structural work. We build the schedule with you before demolition.
The NUMI Method. Listen, Design, Build, Stand Behind. Four stages, in order, every time, with a single project lead throughout.
Tell us about your project and we will set up a consultation, in your home, at your pace.