Whole-home renovation with open-plan living and dining
Home

/

Renovations

/

Complete Home Renovation

Complete Home Renovation in Calgary

One team, one schedule, one point of contact, your whole home. We take houses down to the studs where needed and rebuild them for the way you live now.

3 to 6 months

typical time on site

Fixed scope

signed before work begins

One project lead

drawing to walkthrough

What is included

A complete renovation is where coordination matters most. Kitchens, bathrooms, flooring, walls, electrical and mechanical all interact, and the order of operations decides whether the project takes months or years. NUMI plans the entire scope before work starts and runs it as one continuous build.

Whole-home interior renovations

Structural changes and open-concept conversions

Kitchens and bathrooms within the larger scope

Flooring, trim and doors throughout

Full electrical and plumbing updates

Insulation and window upgrades

Design services for the complete vision

Staged scheduling if you are living in the home

Before and after

A real NUMI project. Drag the handle to compare.

The same kitchen after renovation, opened up with new cabinetry Kitchen before renovation, with dated cabinets and laminate counters

Planning your project

We give you an honest range at your consultation and a fixed number after design. These are the factors that move it, and how long the work takes.

Structural scope

Removing walls and adding beams is engineering plus finishing on both floors.

Mechanical age

Older wiring, plumbing and furnaces often deserve upgrading while walls are open.

Finish level

The same layout can be finished at very different price points.

Living arrangements

Staying in the home is possible but extends the schedule.

How long it takes

Complete renovations typically run three to six months on site depending on scope and structural work. We build the schedule with you before demolition.

The NUMI Method. Listen, Design, Build, Stand Behind. Four stages, in order, every time, with a single project lead throughout.

Common questions

Usually, yes. We hoard off work zones and sequence rooms so you keep a kitchen and bathroom. For the heaviest phases we will tell you honestly if moving out saves time and money.
Almost always. Mobilizing trades once, opening walls once and finishing continuously is more efficient than a room at a time over years.
A fixed scope signed before work starts, and written approval for any change. The process is the same as our smallest projects, applied rigorously.
Yes. Complete renovations include design services so the whole home resolves as one vision instead of a collection of decisions.
Renovated Calgary home interior in daylight

Ready to talk about your complete home renovation?

Tell us about your project and we will set up a consultation, in your home, at your pace.

Book a Consultation